Integrity Maintenance was selected by Bishop State Community College to support critical site improvements at the Carver Campus. The project blended function with form—combining restorative repair with fresh landscaping to help restore and enhance the school’s grounds following structural damage. With a focus on precision, communication, and quality control, our team managed both the restoration and beautification process from start to finish.
Project Goals
Execute landscape installation in alignment with design specifications
Implement a two-zone irrigation system for long-term plant health
Repair a non-structural brick façade impacted by vehicle damage
Install a new campus flagpole and provide full cleanup and haul-off post-completion
Primary Objective
To execute a comprehensive landscaping and exterior maintenance project that not only restored integrity to the building after damage but also elevated the overall look, usability, and sustainability of the Carver Campus grounds.
Design & Architecture
Installation of over 80 shrubs and trees including Wintergreen Boxwood, Gardenia Frost Proof, and Juniper Parsonii
Placement of St. Augustine sod across 900 square feet of campus green space
Spread of pine straw mulch in designated beds for soil protection and polished appearance
Installation of a full Rain Bird irrigation system, divided into two zones for north and south areas
Repair of a damaged brick veneer on the south elevation